PREPARING FOR HYDROGEN COMMISSIONING
The Wildfire team is currently installing hydrogen separation equipment into the MIHG pilot plant ready for commissioning. The new equipment includes a gas holder, syngas compressor and a pressure swing adsorption (PSA) unit especially designed and manufactured in Europe. The photo shows the new PSA at the pilot plant.
In the coming months Wildfire will convert a range of wastes into hydrogen suitable for fuel cell vehicles and green ammonia synthesis. Stay tuned for more announcements!