Greetings from Bridging Solutions!
This installment of “A Bridge Moment” provides a copy of a magazine article that was published in the June 2015 Florida Engineering Society Journal. It was written by Ralph Verrastro, PE and is titled PRECASTSLAB + (GRS + IBS) = ABC. The article provides design and construction details related to the FDOT design-build bridge replacement project for the Rock Ridge Road Bridge over Gator Canal in Polk County, Florida. Send any questions or comments regarding this article to Ralph at ralph@bridging-solutions.com or call him at 239-216-1370. The article may also be accessed through the Blog section of our website.
Here are some other exciting announcements we want to share:
- Kevin Shah, EIT started working for Bridging Solutions last week in our Tampa, Florida office. He is a recent graduate from the University at Buffalo (UB) with a Master of Science degree in Bridge Engineering. UB is one of the only universities that offers a specific degree in the specialty of bridge engineering – check out what they offer here.
- Ralph Verrastro, PE, Rolando Corsa, PE of Bridging Solutions and Robbie Powell with Wright Construction Group will be presenting a technical paper titled Phased Accelerated Bridge Construction with GRS/IBS Abutments at the National Accelerated Bridge Construction Conference in Miami, Florida on December 8, 2015. We hope you can attend – check out the other interesting programs available at the conference here.
- We relocated our Naples, Florida headquarters office last month. The new address is:
Bridging Solutions, LLC
15863 Secoya Reserve Circle
Naples, FL 34110